Service

Mobile Shelving Reinstallation

Reinstallation of existing mobile shelving at a new site — track lay, level, square, brake set, anti-tip test and PUWER certification.

What's included

  • Track level tolerance ±2mm
  • Carriage square & brake test
  • Anti-tip & end-stop verification
  • PUWER inspection certificate

Our process

  1. Step 1
    Level
    Laser-level floor survey; shim or grout as required.
  2. Step 2
    Track
    Track lay with anti-creep fixings and end-stop fitment.
  3. Step 3
    Rebuild
    Carriages, decks and uprights reinstated in original sequence.
  4. Step 4
    Test
    Full PUWER inspection cycle, signed off.
Reinstallation is where amateurs come unstuck. A 1mm track variance over a 6m run compounds into binding carriages and failed brakes — our team levels every run to ±2mm before a single carriage is craned in.
FAQs

Shelving Reinstallation — your questions answered

Do you supply replacement parts?
Yes — through our parent Rackstor we source carriages, gaskets, brakes and end-stops for all major brands.
Quotations within 24 hours

Ready to relocate your mobile shelving?

Send us a sketch, photo or floor plan of your existing roller racking. Our SEMA-aligned team will respond with a fixed nationwide quote within one working day.

A trading service of Rackstor UK Ltd — UK storage, racking & shelving specialists.