What's included
- Post-installation PUWER 98 inspection
- Track levelness verified to manufacturer tolerance
- Brake, anti-tip & end-stop verification
- Certificate emailed within five working days
Our process
- Step 1ReinstallSystem rebuilt and tracks re-laid to within ยฑ1mm at the new site.
- Step 2InspectFull inspection of tracks, carriages, brakes, anti-tip and end-stops in the new position.
- Step 3RemediateAny defect rectified before the system is loaded.
- Step 4CertifyPUWER certificate issued to the duty-holder and lodged on file.
Standalone annual PUWER and BS EN 15095 inspections โ where no relocation is involved โ are delivered by our sister company Rack Safety Inspections. We scope this page strictly to post-relocation sign-off.
Every relocation finishes with a PUWER inspection and certificate โ read our SEMA racking inspection guide to see exactly what's checked before sign-off.