48-hour weekend relocation of clinical records
Faultless from survey to PUWER certificate. The wards never knew it had happened.

Generic removal firms rarely understand mobile shelving. The result is bent tracks, jammed carriages, archive disruption and compliance failures that cost far more than the move itself.
Whether you call it mobile shelving or roller racking, we dismantle, transport and re-install your existing high-density storage system anywhere in mainland UK. One nationwide team. One fixed quote. Minimal disruption.
Every relocation follows the same documented, repeatable process. No improvisation. No surprises.
From NHS clinical records to police evidence and council archives — we work where downtime, discretion and compliance are non-negotiable.
Faultless from survey to PUWER certificate. The wards never knew it had happened.
They were the only contractor who understood the legacy carriages. Saved us replacing the lot.
Discreet, methodical, on the dot. The reinstall ran smoother than the original system.
A new mobile shelving system runs £20–60k and four months of manufacturing. Your existing system, properly relocated, is faster, cheaper and dramatically more sustainable.
Based in Somerset, deployed nationwide. Tap your area for region-specific information.
Discover why relocating existing mobile shelving is dramatically cheaper than buying new — and how to maximise the saving.
Why the UK uses two terms for the same high-density storage system — and what to specify when you order.
From floorspace recovery to picking-time reductions — the operational wins of moving rather than replacing.
No salespeople. Straight to a SEMA-qualified engineer who has actually moved your system type before.
Send us a sketch, photo or floor plan of your existing roller racking. Our SEMA-qualified team will respond with a fixed nationwide quote within one working day.
A trading service of Rackstor UK Ltd — UK storage, racking & shelving specialists.
Send us a few details and we'll be in touch within 1 hour during working hours. Supply & install, relocation, repair, PUWER inspection, planned maintenance or Europe projects — one specialist team covering it all.